The project's aim is to increase the gas pressure of 56" Shiraz-Isfahan country 4th pipeline. The contract comprises construction of four compressor stations number 5, 6, 7 and 8 in Arsanjan, Safa Shahr, Abadeh and Shahreza towns, respectively.
The capacity of gas transmission is equal to 110 million cubic meter per day where the gas pressure will be increased to 1300 PSIA.