Location: Qazvin – Rasht Expressway
Client: Ministry Of Road And Transportation
Project Objective: Supervision of all activities for construction of the expressway with 138 km length. Road Specifications:
handling a traffic of 53200 cars/ vehicles per day.
Equipped with 10 tunnels with a total length of 5 km where the biggest one is 1763 meters in length.
There are 416 Nos. of medium- sized bridges and 29 No's of big – sized ones with a maximum inlet width of 77 meters.
Type Of Contract: MC
Project Commencement Date: 2003